Author: Bikefast
Belfast bus lane taxi trial ends (but attack on sustainable transport limps on)
The strange saga of the push to get thousands of private hire taxis into Belfast bus lanes continues as the Department for Infrastructure announces the end …
Belfast Bikes – the end?
Over 200 Belfast Bikes have fallen victim to vandalism or theft putting the whole system into a potentially fatal slide
Belfast school run health check (crowd sourcing)
Get involved in a crowd sourced survey of parking provision for bicycles and cars in Belfast schools!
The last word: Belfast Bicycle Network Plan
All of the little tasty tidbits we missed from the main course of our analysis of the Draft Belfast Bicycle Network Plan
Isolation: Belfast Bicycle Network Plan objection
Bikefast’s final objection article takes a look at what should sit above the Bicycle Network to give more power to its elbow and tackle congestion head-on
Quick response template for the Belfast Bicycle Network Plan
If you’re pushed for time to respond to the Draft Belfast Bicycle Network Plan, we’ve helped you with a pick and mix template 🙂
Circulation: Belfast Bicycle Network Plan objection
The ring routes of the Draft Belfast Bicycle Network Plan are a mixed bag – Bikefast delves inside..
Timescale: Belfast Bicycle Network Plan objection
Belfast’s new cycling network is planned over a leisurely 10 to 25 years IF money is made available – we need to tighten up the timescale and commitment
Methodology: Belfast Bicycle Network Plan objection
The Belfast Bicycle Network Plan map needs scrapped – but the replacement needs a top-notch methodology to back it up
Arterial bypass: Belfast Bicycle Network Plan objection
The neighbourhood centres of Belfast life – the arterial streets – have been ignored in the Draft Belfast Bicycle Network Plan